After re-grading the perimeter of the U, our Concrete Division refinished the surface of the U by adding 4” of concrete on top of the existing structure. Additional concrete was also placed around the edge of the U to accommodate a new lighting system. Layton Construction was hired by the university to be the general contractor on the project and restoration funds were raised by alumni.