Working for American Civil Constructors and UDOT under strict time constraints on nights and weekends with very strict traffic control, Greene’s Inc. rock drilled and epoxied thousands of dowel and tie bars into the concrete for added stabilization and strength. Sealing around all the joints of the replaced patches and panels was also required.